2-4 March 2027

Perth Convention & Exhibition Centre

Key Dates & Times

Conditions of Entry

Access to the Perth Convention & Exhibition Centre for exhibitors and contractors during move-in and move-out is via the loading dock or the front entrance.

To ensure a continuous and clear flow of traffic parking is not permitted in the loading dock area.  Handheld items should be delivered from the car park.

Occupational Health & Safety regulations strictly prohibit children from being on-site during the move-in and move-out periods.  This means that children aged 15 years and under are not permitted in the venue at any time during move-in and move-out.

Please note: Safety vests and closed toed shoes must be worn during move in and move out.

The wearing of safety vests will be enforced by the Organiser and security staff during move in and move out. Safety vest will be provided by the Organiser and available during move-in and move-out at the front entrance and at the loading dock.

 

MOVE IN

Space Only Stands & Contractors

Saturday 27 February 2027 8.00am – 8.00pm
Sunday 28 February 2027 7.00am – 8.00pm

Monday – Public Holiday (WA)

1 March 2027 7.00am – 5.00pm

Display Vehicles and Large/Heavy Equipment

Delivery and placement – Friday 26 February from 10am – 2pm (please contact our freight provider GEL Events to make a booking and discuss details).

Shell Scheme Stands

Sunday 28 February 2027 12noon – 6.00pm

Monday – Public Holiday (WA)

1 March 2027 7.00am – 5.00pm
These times are for exhibitors to set up their stands. Please see Delivery times here.

Key Information

  • Shell scheme stands will be built & ready to be occupied by 12noon, Sunday 28 February.
  • These times are for exhibitors to set up their stands.
  • Delivery times can be viewed here.
  • No access will be given for stand build on the opening morning of the show. 
  • All stands must be completed & ready (and all storage and rubbish removed from the premises) by 6.00pm, Monday 1 March.
  • Please note: Monday, 1 March 2027 is a public holiday, Labour Day (WA).

 

 

SHOW OPEN TIMES

Tuesday 2 March 2027

10.00am – 5.00pm (7.00am Exhibitor access)

Wednesday 3 March 2027

9.00am – 5.00pm (8.00am Exhibitor access)

Thursday 4 March 2027

9.00am – 3.00pm (8.00am Exhibitor access)


The Organiser reserves the right to alter the above times.

 

 

MOVE OUT

Shell Scheme Stands & Space Only – PRODUCT REMOVAL

Thursday 4 March 2027 3.30pm – 10.00pm

Space Only Stands & Contractors – BUILD DISMANTLE

Thursday 4 March 2027 5.00pm – 10.00pm
Friday 5 March 2027 7.00am – 4.00pm

Display Vehicles and Large/Heavy Equipment

Move out of vehicles & large/heavy equipment Friday 5 March from 12noon – 4.00pm.

 

Key Information

  • Move-out will commence after the Show has closed and the halls are clear of visitors and it is safe to do so.
  • Exhibitors are advised to remove all valuables and portable items at this time.
  • Exhibitors not requiring loading dock access can hand carry items out via the front entry doors to the carpark from 3.00pm
  • Exhibitor storage will be returned to stands once the loading dock docks are opened at 3.30pm or when it is deemed safe to commence.
  • Exhibitor vehicles will not be permitted onto the loading dock until approximately 4.00pm, once the dock is clear of storage.
  • All Shell scheme stand must be vacated by 8.00pm on Thursday 4 March.
  • All Space Only Stands dismantle to commence from 5.00pm after the majority of shell exhibitors have moved out. This initiative will ease congestion on the loading dock and inside the pavilions.
  • All Exhibitor and Space Only Stands build materials and freight must be removed by 4.00pm on Friday 5 March 2027.
  • Any uncollected freight will be removed by GEL to an offsite warehouse, charges for this service will apply.
  • If you are not able to remove your entire product or stand dressing materials by the times stipulated above, please contact the Organiser.
  • The Organisers reserve the right to alter the above times.
 
Download key dates & times:

 
Related Info: